- Pipe Fittings[478]
- Flanges[10]
- Steel Pipes[10]
- General Mechanical Components Design Services[2]
- Contact Person : Mr. Zhang Hongqing
- Company Name : Hebei Dabohai Pipefitting Co., Ltd.
- Tel : 86-317-6892890
- Fax : 86-317-6892988
- Address : Hebei,Cangzhou,Faces 205 National Highway
- Country/Region : China
- Zip : 061400
ERW pipe
Hebei Dabohai Pipefitting Co.,Ltd.
professional steel pipe supplier and pipe fitting manufacture
Item | Material | Standard | Specification(OD*WT)mm | Usage |
Alloy pipe | Cr5Mo 15CrMo 12Cr1MoV P11/22 T91,P91,P9, T9 Wb36 | GB5310-95 GB9948-88 ASTMA335/A335M ASTMA213/213M DIN17175-79 JISG3467-88 JISG3458-88 |
16-824*2-100 | The seamless steal pipes features resistance to high presure,high/low temperature and corrosion ano is used in the industries of petroleum,chemical engineering and. Electric pwer as well as boiler |
High-pressure boiler pipe | 15CrMoG 12Cr1MoVG 20G,A106, ST 45-8
| GB5310-95 ASTM A 106-99 DIN17175-79 |
14-830*2-80 | Temperature-resistant seamless steel pipe far high-pressure boiler |
Seamless pipes for petroleum
| 20, 12CrMo, 15CrMo, Cr5Mo, Cr9Mo |
GB9948-88 | 10-530*1.5-36 | Boiler pipes for refinery,heatexchangeing pipes,seamless steel pipes for pipeline |
High-pressure Seamless pipes for fertilizer making equipment | 20, 16Mn, Q345 | GB6479-2000 | 18-530*3-40 | Fertilizer making equipment and pipe line |
Low and mediun pressure boiled pipe | 10,20 | GB3087-1999 | 10-530*2-40 | Over-heat pipe for low and medium pressure boiler,boilling water pipe,locomotive somke pipe(big and small) |
Fluid pipe | 20, Q345 | GB/T8163-1999 | 8-630*1.0-40 | Fluid feeding |
Structural pipe | 10,20,35,45, 16Mn,Q345B | GB/T8162-1999 | 6-1020*1.5-100 | For commom structure |
Line pipe | Gr..B | API5 L/CT | 21.3-914*1.5-120 | Carrying gas,water or oil in the industries of petroleum and natural gas |
Hydraulic prop pipe | 27SiMn | GB/T17396-1998 | 70-377*9-40 | Hydraulic support and prop |
Surface Treatment:
Transparent oil or black painting anti-corrosion or 3PE
Application:
Natural gas, petroleum, chemical industry, electric power, metallurgy thermodynamic fields, water supply engineering, steam heating, hydroelectric power station and long pipeline transportation projects.
Packaging:
Wooden Cases or wooden pallet bundle packing, paint on the pipe, plastic covers at the ends or as per customer requirement.
Min Order Quantity:
5 Metric Ton If less than 5 tons can be solved by our communication
Port:
TianJin XinGang Port
Delivery Time:
According to customer’s requirements or normal delivery
Authentification:
ISO 9001:2000 API 5L/5CT CCS
Delivery Term:
FOB (30% downpayment in advance, the balance before shipment)
CIF (30% in advance, the balance against with the copy of B/L)
ERW pipe